Project:
SPGFD - PHASE 2 - 4" Subsea Pipeline ROV Survey in SPD3
Client:
Pars Oil and Gas Company - POGC
Location:
South Pars Gas Field – Persian Gulf, Iran
Purpose:
ROV Survey for 4" Piggy back Subsea Pipeline of SPD3 Phase2
Scope of work:
Based on Client information phase 2 pipeline (SL1) from shore to SPD3 was damaged by Anchoring activity so the objectives of Pipeline Inspection survey were as follows:
- Gathering Geophysical survey data from shore on SL1 pipeline to platform
- Locating the SL1 pipeline and its piggy back
- Locating the exact damage point of pipeline
- Visual Inspection by ROV on damage point(s)