Project:
SPGFD- PHASE 19, Spool Installation and Pre-commissioning of 32″ & 4″ pipelines
Client:
Pars Oil and Gas Company - POGC
Location:
South Pars Gas Field – Persian Gulf, Iran
Purpose:
Pre-fabricated 32-inch and 4-inch Spools Transportation, Installation and Pre-commissioning of phase 19 – 19A and 19C platforms
Scope of work:
Engineering, Review Metrology Documents, Checking and confirming Dimension Control of fabricated Spool pieces, performing FCG, Spools Load out verification, Spool piece installation and Tie-in Operation, as-built survey of Dog legs and riser clamps, performing HDSDN. Two tie-in operations including installation of 10 pieces of spools had to be performed by RAL: 4 X 32 inch and 6 X4 inch.